Installation and Training Aids
Steps 1 & 2. Gage and mark pipe ends.
Position fittings over marks
Steps 3 & 4. Engage LOKTOOL head.
Make-up swage ring.
Step 5. Remove LOKTOOL head.
Inspect completed job.

Play wait for demonstration to download (110k)
Scroll through the five steps by clicking on arrow.

 

Field Installation Guides


Download Acrobat Reader for these files

 

 

 

 

U.S. Headquarters:
38376 Apollo Parkway
Willoughby, Ohio 44094
Map to LOKRING

Toll Free 1-800-876-2323 
Phone: (440) 942-0880
Fax: (440) 942 -1186