Installation Process and Video

The following process walks through the installation of a LOKRING fitting. The installation is a 5-step process to ensure a quality fitting for any environment. The video at the bottom of the page shows the process from the beginning to the end.

 

Steps 1 & 2. Cut and sand pipe. Gage pipe – mark pipe ends.

 

Steps 3 & 4. Select and assemble LOKRING tool. Actuate tool to install fitting.

Step 5. Remove LOKRING tool.
Inspect completed job.